Consumer unit certification guide

Consumer Unit Replacement Certificates: EIC and Part P

A consumer unit replacement should leave you with more than a new board. In England, electrical testing and building compliance notification produce different records. Knowing what each document covers helps homeowners and landlords ask the right questions before booking and keep a useful paper trail afterwards.

Published November 2026 · Updated November 2026 · Top Volt Electrical

The EIC records the installation and its testing

An Electrical Installation Certificate (EIC) is the electrical certificate for the completed consumer-unit replacement. It records the work covered, the people responsible and the results of the relevant inspection and testing. Its schedules provide important technical information about the circuits and protective measures; keep the complete document, not just its front page.

Changing a board is not simply swapping the enclosure. The electrician must assess the suitability of the existing installation for the proposed work and carry out the necessary testing. If defects are found, ask what needs correcting and whether it is included. An EIC relates to its stated scope: it should not be presented as proof that every part of an older installation has been renewed.

Part P notification is a separate building compliance step

Replacing a consumer unit in a dwelling in England is notifiable work under the Building Regulations. Part P concerns electrical safety, while notification deals with the building compliance process. For a contractor registered with a relevant competent person scheme such as NAPIT, eligible work can be self-certified and notified through the scheme rather than requiring a separate building control application by the homeowner.

Confirm who will make the notification and how you will receive the building compliance certificate. Top Volt’s notification route is through NAPIT; ask for the registration details if you want to check them. The compliance certificate and the EIC serve different purposes and may arrive separately. Do not assume that receiving the EIC means the notification paperwork has also arrived, or that notification will be completed on the installation day.

An EICR is not the same document as an EIC

An Electrical Installation Condition Report (EICR) assesses the condition of an existing electrical installation at the time of inspection, within the report’s agreed scope and limitations. It identifies observations and whether the assessed installation is satisfactory. An EIC instead records new installation work or an alteration, such as the consumer-unit replacement.

An EICR can help establish what remedial work is needed before an upgrade, but it does not replace the EIC for the work completed. Equally, fitting a new board does not automatically turn an unsatisfactory EICR into a satisfactory report: issues elsewhere, including damaged wiring or defective accessories, may remain.

What landlords should clarify

If the property is let, explain whether the replacement follows an EICR and provide the report before quoting. Ask which observations the work will resolve, what other remedial work is necessary and what written evidence will confirm completion. Keep the original report alongside the new documents so there is a clear record of the defects and the action taken.

Do not treat the new board’s EIC as an automatic whole-property EICR pass or a reset of every inspection obligation. Ask the electrician how the certification relates to the existing report and what further inspection or confirmation is required for your circumstances.

Put the paperwork in the written quotation

Before booking, ask the contractor to identify the proposed board and protection, the testing included and the certification and notification arrangements. Agree how unexpected defects will be discussed before additional work proceeds. This helps you compare the complete job rather than a headline installation price.

  • Will I receive the full EIC, including inspection and test schedules?
  • Who will notify the replacement through NAPIT, and how will the building compliance certificate reach me?
  • Which existing defects are included, and what work remains outside the quote?
  • If an EICR prompted the work, what evidence will address its observations?

Keep a complete property record

Save the quotation, invoice, full EIC, building compliance certificate and any EICR or remedial records together. Check the property address and description of work, and query missing pages or unclear entries. These documents help future electricians understand the installation and can be useful when selling, letting or arranging further alterations.

Reference: GOV.UK Approved Document P: electrical safety in dwellings in England. The appropriate work depends on the condition of your installation.

Get a quote with certification clearly explained

Talk to Top Volt Electrical about your South London consumer-unit replacement. Share any existing EICR so the quotation can explain the work, testing, Electrical Installation Certificate and NAPIT notification arrangements.

Explore consumer-unit upgrades

Frequently asked questions

What certificates should I get after a consumer unit replacement?

For a dwelling in England, expect an Electrical Installation Certificate with its schedules and building compliance documentation for the notifiable replacement. Confirm the notification route in the quote; the two documents may be delivered separately.

Is an EICR enough instead of an EIC?

No. An EICR describes the condition of an existing installation. The consumer-unit replacement needs the appropriate installation certificate recording the work and testing, as well as the separate building compliance notification process.

Does NAPIT notification replace electrical testing?

No. Scheme notification addresses building compliance. The electrician still needs to inspect and test the installation work and provide the EIC. Receiving one document does not remove the need for the other.

Will replacing the board make my rental property pass its EICR?

Not automatically. A board replacement may address some observations, but defects on other parts of the installation can remain. Ask for a clear remedial scope and appropriate evidence that the identified issues have been resolved.

What if the compliance certificate has not arrived?

Contact the contractor to confirm whether notification has been submitted, check the property and contact details, and ask how to obtain the certificate through the scheme. Keep the EIC safe while following up; it is a separate record.

Call now Free quote